Close Menu
    Trending
    • BCCI confirms 350-player list for IPL 2026 mini-auction; Big overseas names added late
    • Winless Fiorentina on Course For Record
    • ‘Fans angry and I get it’, says Edwards
    • Lorenzo Musetti announces addition of this veteran coach to his team… | ATP Tour
    • Lando Norris’ race engineer Will Joseph ‘very proud’ to be part of McLaren driver’s title success as he explains ‘toughest bit’ of his job
    • How the current Springboks compare to the 2015 All Blacks in final quarter dominance
    • Analyst demands an answer after controversial Raiders finish
    • Mohsin Naqvi vows to make PSL the No.1 league; Wasim Akram calls it No.2 but brutally trolls IPL
    The Sports Pulse News
    • Home
    • Sports News
    • Cricket
    • Football
    • Tennis
    • Basketball
    • NBA
    • Football News
    • More
      • Formula 1
      • Golf
      • Rugby
    The Sports Pulse News
    Home»Golf»Hye-Jin Choi maintains tournament-long lead at LPGA Malaysia
    Golf

    Hye-Jin Choi maintains tournament-long lead at LPGA Malaysia

    The Sports Pulse NewsBy The Sports Pulse NewsNovember 1, 2025No Comments2 Mins Read
    Share Facebook Twitter Pinterest LinkedIn Tumblr Reddit Telegram Email
    Share
    Facebook Twitter LinkedIn Pinterest Email


    KUALA LUMPUR, Malaysia — Sustaining the lead she has held for the reason that opening spherical and searching for her first win on the LPGA Tour, Hye-Jin Choi will take a four-stroke benefit into the ultimate spherical of the Maybank Championship after taking pictures a 5-under 67 Saturday.

    Choi, who performed on the South Korea staff in final week’s Worldwide Crown, had a 54-hole whole of 19-under 197 on the Kuala Lumpur Golf and Nation membership course. She began the day with a five-stroke lead.

    The 26-year-old Choi has 28 profession top-10 finishes and positioned second on the 2017 U.S. Girls’s Open as a 17-year-old beginner.

    It’s the first time in her profession she has led after the primary three rounds of play and the third time she has led a match heading into the ultimate spherical. The earlier two instances she completed runner-up.

    “I have been ready for this a extremely lengthy and I will attempt my finest tomorrow,” Choi mentioned. “I feel I’ll really feel like I am making the dream and I simply think about on it. I am simply searching for a victory tomorrow.”

    China’s Liu Yan (65) was in second place after a bogey-free spherical and Hannah Green, a member of the winning Australia team on the Worldwide Crown final weekend, was in third after a 67, 4 strokes behind Choi.

    A Lim Kim was the most important mover with a 64 that left her in a tie for fourth place, six strokes off the lead. Kim’s spherical included an eagle on 18 and 6 birdies.

    “It was an important shot, however inconceivable,” Kim mentioned of her 25-foot eagle putt on 18. She began her spherical with 4 birdies in 5 holes.

    World No. 1 Jeeno Thitikul, a runner-up in Malaysia the final two years, shot 65 and was additionally in a fourth-place tie. She birdied her last three holes Saturday.

    “I do not know what is going on on, however it’s good,” mentioned Thitikul. She credited her many followers within the gallery for his or her help, saying once more the venue was like a “mini-Thailand” for her.

    Defending champion Yin Ruoning shot 69 and was in seventh place, seven strokes behind Choi and tied with New Zealander Lydia Ko (68). Brooke Hendeson shot 68 and was 11 strokes behind.

    Subsequent week, the LPGA ends its five-week Asian swing with the Japan Basic at Shiga.



    Source link

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Previous ArticleNASCAR Championship Race preview: Favorite, underdog, top storylines
    Next Article PREM clubs eye rising NZ star Dylan Pledger
    The Sports Pulse News

    Related Posts

    Golf

    2028 L.A. Olympics push The Open to latest start since 1893

    December 8, 2025
    Golf

    Golf Cart Safety & Injuries Around the World: What Every Traveling Golfer Should Know – Golf News

    December 8, 2025
    Golf

    Reitan clings on to claim victory at Nedbank – Golf News

    December 8, 2025
    Add A Comment

    Comments are closed.


    Top Posts

    Rohit Sharma, Abhishek Sharma remain untouchable at No.1 in ICC Rankings despite Pakistan players’ massive rise

    November 5, 2025

    Emilio Nava wins fourth Challenger title of 2025 | ATP Tour

    September 22, 2025

    How MLB playoff races look going into final month of season

    August 30, 2025

    Sourav Ganguly orders Gautam Gambhir to recall Mohammed Shami to win Test matches

    November 16, 2025

    Ferrari’s Deputy Team Principal Jerome d’Ambrosio on Rafael Camara’s title win, growth with the Scuderia and what’s next for the F3 Champion

    August 8, 2025


    Categories
    • Basketball
    • Cricket
    • Football
    • Football News
    • Formula 1
    • Golf
    • NBA
    • Rugby
    • Sports News
    • Tennis



    Most Popular

    ‘Proud’ Josh Allen inspires brilliant Buffalo comeback as Sean McDermott masterplan frustrates Baltimore Ravens

    September 8, 2025

    Max Verstappen not getting carried away after P2 finish at Zandvoort as he hopes Red Bull can avoid ‘very tough’ Monza repeat

    September 5, 2025

    England’s Nat Sciver-Brunt outlines her priorities ahead of first assignment as full-time captain

    May 15, 2025
    Our Picks

    BCCI confirms 350-player list for IPL 2026 mini-auction; Big overseas names added late

    December 9, 2025

    Winless Fiorentina on Course For Record

    December 9, 2025

    ‘Fans angry and I get it’, says Edwards

    December 9, 2025
    Categories
    • Basketball
    • Cricket
    • Football
    • Football News
    • Formula 1
    • Golf
    • NBA
    • Rugby
    • Sports News
    • Tennis
    • Privacy Policy
    • Disclaimer
    • Terms and Conditions
    • About us
    • Contact us
    Copyright © 2025 Thesportspulsenews.com All Rights Reserved.

    Type above and press Enter to search. Press Esc to cancel.